R. Mitteau, B. Calcagno, P. Chappuis, and A. , Fus. Eng. Des, vol.88, issue.6-8, pp.568-570, 2013.

R. Raffray, Nucl. Fusion, vol.54, 2014.

, ASM handbook, vol.3

H. Altmann, in: Proceedings of the 1993, IEEE/NPSS 15th Symposium on Fusion Engineering, vol.2, 1994.

J. Araki, , pp.632-637, 1996.

A. Odegard, Fus eng des, pp.309-316, 2000.

A. Cardella, Al. FT, vol.38, 2000.

S. Banetta, Fusion Engineering and Design, vol.89, pp.970-974, 2014.

I. Mazul, V. A. Belyakov, and R. N. Giniatulin, Fus Eng Des, vol.86, issue.6-8, pp.576-579, 2011.

J. Schlosser, Exp High Heat Flux Testing Impact on the Tore Supra Toroidal, Pumped Limiter Achievement, 2003.

, Manufacturing and testing of a NHF FW semiprototype for EU-DA pre-qualification, F. Zacchia, this conference

G. Perez, Investigation on bonding defects at the ITER first wall beryllium armour by combining analytical and experimental methods

G. Lovato, , 1995.