EURATOM-ROSATOM-ERCOSAM-SAMARA projects scaling from nuclear power plant to experiments, These proceedings ,
Modelling of stratification and mixing of a gas mixture under the conditions of a severe accident with intervention of mitigation measures ,
,
Analysis of stratification and mixing of a gas mixture under severe accident conditions with intervention of mitigation measures ,
, TOSQAN facility description, IRSN, ERCOSAM P3.2 (2011-04), 2011.
SPOT facility description, OKBM, ERCOSAM D5, pp.2012-2021, 2012. ,
MISTRA facility description, CEA, ERCOSAM P3.3 (2011-03), 2013. ,
PANDA facility description, 2011. ,
TOSQAN test protocols for 114-115-116 test, IRSN, ERCOSAM P3, pp.2012-2019, 2012. ,
TOSQAN test report, ER-COSAM tests 114-115-116, vol.8, pp.2013-2022, 2013. ,
SPOT test protocols, JSC Afrikantov OKBM, ERCOSAM D5, vol.12, pp.2013-2028, 2013. ,
SPOT data analysis report, JSC Afrikantov OKBM, ERCOSAM, vol.3, 2014. ,
Test protocol for MISTRA MERCO_0 test: Phases I to III without SAMs activation, CEA, ERCOSAM P3.4_MERCO_0 (2012-6a), 2012. ,
Quick Look Report for MISTRA MERCO_0-Steam, 2012. ,
Test protocol for MISTRA MERCO_1 test: Hollow cone spray test, CEA, ERCOSAM P3.4_MERCO_1 (2012-6b), 2012. ,
Quick Look Report for MISTRA MERCO_1 tests: Hollow cone spray test, CEA, ERCOSAM P3.9B (2012-12b), 2012. ,
Test protocol for MISTRA MERCO_2 test: Middle condenser cooling test, CEA, ERCOSAM P3.4_MERCO_2 (2012-6c), 2012. ,
Quick Look Report for MISTRA MERCO_2 tests: Middle condenser cooling test, CEA, ERCOSAM P3.9C (2012-12c), 2013. ,
Test protocol for MISTRA MERCO_3 and MERCO_4 tests: Heater tests, CEA, ERCOSAM P3.4_MERCO_3&4 (2012-6d), 2012. ,
Quick Look Report for MISTRA MERCO_3 and MERCO_4 tests: Heater tests, CEA, ERCOSAM P3.9D (2013-18), 2013. ,
Test protocol for PANDA test PE1, 2012. ,
Test report for PANDA test PE1, 2012. ,
Test protocol for PANDA test PE2, 2012. ,
Test report for PANDA test PE2, 2013. ,
Test protocol for PANDA test PE3, cooler test, PSI, pp.3-6, 2012. ,
Test report for PANDA test PE3, cooler test with wall condensation, pp.2013-2017, 2013. ,
Test protocol for PANDA test PE4, 2012. ,
Test report for PANDA test PE4, 2012. ,
Test protocol for PANDA test PE5, cooler test, PSI, pp.3-6, 2012. ,
Test report for PANDA test PE5, cooler test with wall condensation, PSI, ER-COSAM P3.7E (2013-05), 2013. ,
PAR elevation influence on hydrogen floor layer depth, Proc. of NURETH-14, 2011. ,